REPORT AND RECOMMENDATIONS, EXPLORATION PROGRAM SUMMER 2015, POSTE LEMOYNE EXTENSION. GM 69865, 2016. 110 pages and 7 maps.
BOUCHARD, R. A.., GIRARD, T.



Abstract

To conclude, the Poste Lemoyne Extension exploration program in summer 2015 consisted in a detailed mapping of Edy Area including MEA sampling and structural data survey, a lithogeochemical survey and a RC drilling campaign. The detailed mapping of the Edy Area helped to better understand the geological context and the connection between the different intrusive rocks. The geology characterizing the Edy showing do not seems to extend over 150 meters to the East. The gold values obtained during the summer 2015 campaign are lower than in the Edy showing but a connection could be made between the lithology contacts and the mineralization. The MEA samples returned gold values between 0.102 to 0.622 g/t Au and 1 MEA sample returned 0.128% Cu. The geological map in the Edy Area was adjusted with the detailed mapping in accordance with the high resolution magnetic map performed by Mines Virginia Inc. in 2011 (actually Osisko Exploration James Bay).

Details

Document type

Mining exploration companies document
Assessment work

Field of activity

General geology

Type of survey

Rock analysis
Geological survey

Cross-reference

Also see GM 69866

Document type

Mining exploration companies document
Assessment work

Field of activity

General geology

Type of survey

Rock analysis
Geological survey

Cross-reference

Also see GM 69866